A typical boiler installation takes 1 to 3 days, including a system powerflush. The exact timing depends on the complexity of the job. Here's a general guide:
Straight replacement
(same type, same location): 1–2 days
System upgrade
(e.g., combi to system boiler): 2–4 days
Boiler + hot water cylinder replacement: 2–3 days
Relocation or additional pipework: 2+ days
Please ensure these areas are clear and accessible before the installation:
Radiators – To bleed or test the system, and open/close TRVs during powerflushing
Boiler location – Kitchen, utility room, cupboard, or loft—this is the main workspace
Gas meter – To shut off the gas supply and perform safety checks
Water mains – Usually under the kitchen sink or near the stopcock
Flue exit point – Typically a wall or roof; needs to be safe and compliant
Consumer unit (fuse box) – For wiring boiler controls or adding a fused spur
Outside tap & drain – Preferred for powerflushing the system
Listed building or external design requirements?
Let us know in advance so we can match materials (e.g., bricks) and position the flue discreetly.
Temporary service interruption
Gas and water will be briefly shut off—we’ll keep this as short as possible.
Sensitive to noise or dust?
Drilling and heavy tools can be disruptive. If needed, we suggest being away during this part of the work.
Your installer will walk you through everything during the initial survey. To keep things moving smoothly, please ensure access to all the relevant areas ahead of time.